Friday, July 8, 2016

Fenton Home" Friday" Windows

Its always good when "Friday's" come around.
Today windows, wiring, and floor.




 The Foy's wrapping the window



 Drilling holes

 This is the Master bedroom, the floor drops down, from the family room,
plus has a fall in the floor of 5 inches, so a new level floor will be added.
 Grain pump needed some work so Elder Gibson helped Gerald with the pump.


 Electrical Company shows up to connect power to the house.
 One of the Barns was falling down, so we have been using the wood.
So Elder Gibson and I went over to tear apart the beams.

Beams loaded up and ready for the new floor!

 Elder Gibson working on the floor for the Master Bedroom.
 3 Military Helicopters fly over the house.

No comments:

Post a Comment