Old floor joist removed.
Added the joist hangers, to hold the floor in place, and yes this time the joist are nailed.
Gerald with a 2 x 10 for the floor
Elder Gibson hoisting up the beam to place the blocks to hold the beam.
While the men work on the inside, I sanded and prepped the doors for painting.
New floor joist, and clean insulation. Looks good!
Placing the floor down.
Scrapping off the popcorn from the ceiling
This is Gerald he is helping us out while we get this home ready.
We have a week and half to finish.
No comments:
Post a Comment