Elder Gibson was concerned about the floor joist's not been secured.  So he decided to check the other side of the house.  Same situation yucky, stuff on top of insulation.  Oh I know you, didn't want to know that.  Yes the floor joist were loose.  I mean not even nailed to the beam.  So is the life of remodels.  You start with a plan but the house has its own plan.


Old floor joist removed.
Added the joist hangers, to hold the floor in place, and yes this time the joist are nailed.
Gerald with a 2 x 10 for the floor
Elder Gibson hoisting up the beam to place the blocks to hold the beam.


While the men work on the inside, I sanded and prepped the doors for painting.

New floor joist, and clean insulation.  Looks good!

Placing the floor down.
Scrapping off the popcorn from the ceiling
This is Gerald he is helping us out while we get this home ready.
We have a week and half to finish.









Elder Gibson

Beautiful Sky!!

Funny Foamy Mushrooms

More floor to be laid
 
Red Bellied Woodpecker
  


The popcorn ceiling all over the floor, clean up tomorrow!

 




1st coat of sheet rock mud